欧美又粗又大xxxxbbbb疯狂,国产综合精品久久亚洲,午夜亚洲www湿好爽,亚洲偷自拍另类图片二区,国产爆乳美女娇喘呻吟久久,亚洲视频免费一区二区三区,婷婷激情六月,2021精品综合久久久久 上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 日本一区二区三区四区看片| 国产桃色精品网站| 日韩精品极品免费观看| 亚洲免费人成网站在线观看| 亚洲av毛片成人精品| 日本一区不卡高清在线观看 | 欧美性猛交xxxx| 精品奶水区一区二区三区在线观看| 国产V日韩V亚洲欧美久久| 成人午夜高潮免费视频在线观看| 97色伦97色伦国产| 亚洲AV综合A∨一区二区| 99热成人精品国产免| 另类色综合| 高清久久精品亚洲日韩Av| 五月婷婷丁香综合| 人妻猛烈进入中文字幕| 国产精品亚洲综合色区丝瓜| 精品人妻丰满久久久a| 亚洲av成人一区二区三区色| 国产日韩三级| 麻豆av一区二区三区久久| 国产噜噜在线视频观看| 国产成本人片免费a∨短片| 国产欧美成人不卡视频| 欧美福利在线| 亚洲欧美激情另类| 99精品视频在线观看免费播放| 精品久久久中文字幕二区| 亚洲区精品久久一区二区三区女同| av一区二区不卡久久| 亚洲大尺度动作在线观看一区 | 午夜三级网站| 婷婷色婷婷| 日韩人妻少妇中文字幕av| 久久av一区二区三区下| 国产免费无码9191精品| 欧美人与动性xxxxx杂性| 极品白嫩的小少妇| 内射女校花一区二区三区| 亚洲精品97久久中文字幕无码|