欧美又粗又大xxxxbbbb疯狂,国产综合精品久久亚洲,午夜亚洲www湿好爽,亚洲偷自拍另类图片二区,国产爆乳美女娇喘呻吟久久,亚洲视频免费一区二区三区,婷婷激情六月,2021精品综合久久久久 上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 少妇人妻丰满做爰xxx| 精品黑人一区二区三区| 日本大尺度吃奶呻吟视频| 99riav国产精品视频| 一线二线三线天堂| 国产精品国产亚洲区艳妇糸列短篇 | 乱人伦中文字幕在线不卡网站| 波多野结衣免费一区视频| 亚洲欧美中文日韩v在线观看 | 波霸影院一区二区| 日本污视频| 国产一级α片| 欧美精品一区在线看| 超碰av男人一区二区| 免费夜色污私人影院在线观看| 亚洲熟妇无码av| 国产av精国产传媒| 国内精品自在欧美一区| 国产av一区二区三区福利| 国产丰满乱子伦无码专| 国产丝袜精品不卡| 樱花AV在线无码| 亚洲中文字幕日产喷水| 伊人久久大香线蕉亚洲五月天| 久久www香蕉免费人成| 国产综合在线观看| 男人吃奶摸下挵进去好爽| 国产精品无码一区二区三区| 亚洲成a人v欧美综合天堂麻豆| 国语自产偷拍精品视频偷拍| 性史性农村dvd毛片| 老熟女重囗味hdxx69| 天美麻花果冻视频大全英文版| 伊人色综合久久天天人手人婷| 午夜肉伦伦影院| 丰满少妇被猛男猛烈进入久久| wwwsex国产精品| 人与鲁专区| 国产在线看不卡一区二区| 午夜无码区在线观看| 久久久精品欧美一区二区免费|